Skip to content
Projects

Florida DOT

Hurricane Starlink deployments

SpaceX Starlink deployments that restored critical communications across impacted regions after Hurricanes Ian and Nicole.

Role
Technical Support Engineer II (Contract)
When
Sep–Nov 2022
Team
15–25
Method
Rapid response, prioritized by impact
  • 150

    Starlink units deployed

  • 2

    hurricanes: Ian and Nicole

  • Statewide

    deployment across impacted regions

  1. Situation

    Hurricane Ian in September 2022 and Hurricane Nicole in November 2022 cut terrestrial connectivity to offices and critical facilities across Florida.

  2. Task

    Restore network connectivity fast by deploying SpaceX Starlink satellite internet to areas without terrestrial service, on emergency timelines.

  3. Action

    • Coordinated the statewide deployment on an accelerated timeline, defining scope and prioritizing locations by operational impact.
    • Configured and validated every Starlink unit, and documented the installation procedure.
    • Logged credentials securely and set up asset tracking for inventory, locations, and deployment status.
    • Confirmed installations with field teams, kept real-time tracking of every device, and reported status to leadership.
  4. Result

    • Deployed about 150 Starlink units statewide across both storms, restoring critical communications within emergency response timelines.
    • Impacted offices and facilities kept operating while terrestrial networks were down.
    • Every unit was configured, documented, tracked, and confirmed operational.

More from this role

  • End-of-life workstation refresh

    Jun–Aug 2022

    Replaced 200+ end-of-life workstations across multiple buildings: scheduled swaps with users, migrated their data, updated asset records, and decommissioned the old devices compliantly.

  • On-premises server upgrade

    Dec 2022 – Jan 2023

    Replaced three on-premises servers during after-hours maintenance windows, with validation before and after, for better stability and minimal user impact.

  • SunTrax campus deployment

    Feb–May 2023

    Assessed technology needs and deployed standardized workstations across SunTrax, a 475-acre, multi-building transportation research campus.

  • Day to day

    Held 100% ticketing SLA compliance in a 10,000+ user environment; supported a four-host VMware ESXi cluster, Active Directory, GPOs, and VM provisioning; and automated workflows in PowerShell, raising departmental efficiency 50%+.

Tools

SpaceX Starlink / Asset tracking / Field coordination / Emergency response

Sources

TPM resume